    Project Overview

    EARTHTEK Paving and Grinding Inc completed this school paving project to improve safety, accessibility, and curb appeal across the campus. Our crew handled full site preparation, installed a smooth, durable asphalt surface, and finished with crisp, clearly marked parking lot striping — creating a safer environment for students, staff, and visitors alike.

    School campuses see constant traffic from buses, parent drop-offs, staff vehicles, and pedestrians, making a well-graded, professionally installed asphalt pavement essential. High-visibility striping — including designated stalls, crosswalks, fire lanes, and ADA-accessible spaces — keeps traffic flowing safely and helps the campus stay compliant.

    Scope of Work

    • Site preparation and grading
    • Commercial asphalt paving installation
    • Parking lot striping and pavement markings

    Why This Project Was Needed

    Aging school pavement isn't just a cosmetic issue — it's a safety and liability concern. Common warning signs include:

    • Alligator cracking or potholes — indicates base failure and creates trip hazards for students
    • Standing water and poor drainage — accelerates pavement deterioration and creates slip hazards
    • Faded or missing striping — causes parking confusion, unsafe pedestrian crossings, and liability exposure
    • ADA non-compliance — outdated accessible stalls, missing signage, or improper slopes can trigger fines and lawsuits
    • Crumbling edges and raveling — loose gravel becomes a hazard near walkways and play areas
    • Unclear traffic flow — missing arrows and crosswalks create conflicts between buses, parent vehicles, and pedestrians during drop-off and pick-up
    before photo showing cracked/faded pavement

    Our School Asphalt Paving Process

    • Site evaluation & assessment — Inspect existing pavement for cracking, drainage issues, and base failure; schedule work around school calendars (summer break, weekends) to avoid disrupting campus operations.
    • Demolition & removal — Mill or excavate failed asphalt and haul it away, often recycling it as reclaimed asphalt pavement (RAP).
    • Grading & sloping — Shape the sub-surface to direct water runoff away from buildings, walkways, and play areas — proper drainage is the #1 factor in pavement lifespan.
    • Sub-base preparation — Install and compact aggregate base rock to create a stable, load-bearing foundation for buses and daily traffic.
    • Proof roll & repairs — Run a loaded truck over the sub-base to detect soft spots; undercut and repair weak areas before paving.
    • Binder course installation — Lay the lower asphalt layer (larger aggregate mix) for structural strength.
    • Surface course paving — Install the smooth top layer of hot mix asphalt with a paver at even depth and grade.
    • Compaction — Compact each layer with vibratory and finish rollers while hot to achieve target density and a sealed surface.
    • Transitions & cleanup — Blend joints where new asphalt meets existing surfaces, sidewalks, and drainage structures; clean the site and allow cure time before reopening.
    crew and paver laying hot mix asphalt

    Our Parking Lot Striping Process

    • Layout planning — Design for traffic flow, stall counts, bus lanes, drop-off zones, crosswalks, and ADA-accessible spaces per current code.
    • Surface cleaning — Sweep and blow off debris so paint bonds properly; new asphalt cures 14–30 days before striping.
    • Measuring & marking — Snap chalk reference lines for straight, uniform stalls, arrows, and lettering.
    • Striping application — Apply traffic-grade paint with a line striping machine for crisp, consistent lines.
    • Stenciling & specialty markings — Add ADA symbols, staff/visitor stalls, fire lanes, crosswalks, directional arrows, and no-parking zones.
    • Curing & reopening — Allow paint to dry (typically 30–60 minutes per coat), remove barricades, and reopen the lot.
    finished striping with ADA stalls and crosswalks

    Equipment Used on This Project

    • Asphalt paver
    • Milling/grinding machine — a core EARTHTEK specialty
    • Motor grader and skid steers
    • Vibratory drum rollers and pneumatic finish rollers
    • Dump trucks and material transfer vehicles
    • Plate compactors for edges and tight areas
    • Line striping machine
    • Stencils, chalk lines, and layout tools

    The Result

    A smooth, clearly marked asphalt surface that improves safety and accessibility for students, staff, and visitors — with proper drainage, ADA-compliant markings, and a traffic layout built to handle busy drop-off and pick-up hours for years to come.

    after photo, wide shot of completed lot

    Need School or Commercial Paving?

    Whether you're a school district, property manager, or facilities director, EARTHTEK Paving and Grinding Inc delivers commercial asphalt paving, grinding, and parking lot striping built for heavy daily use — with scheduling that minimizes disruption to your operations. Contact us today for a free project estimate.

    Gallery

    Get a Free Estimate

    Fill out the form below and we'll get back to you within 1 business day.