EARTHTEK Paving and Grinding Inc completed this school asphalt paving project at Scott Lane Elementary School in Santa Clara, CA, installing a smooth, durable new asphalt surface for the students, staff, and families who use the campus every day. Our crew handled the work on a school-friendly schedule, delivering safe, high-quality pavement with minimal disruption to campus operations.
Elementary campuses are among the most safety-sensitive paving environments there are. The same surfaces serve parent drop-off traffic, staff parking, delivery vehicles, and — most importantly — children walking, running, and playing every single day. Cracked, uneven pavement that would be a minor nuisance at a commercial property is a genuine hazard at an elementary school. This project replaced aging pavement with a smooth, uniform surface built for years of heavy daily use.
Scope of Work
Surface preparation of existing pavement areas
Hot mix asphalt paving installation
Compaction and finish work
Scheduling coordinated around school operations
Why This Project Was Needed
School districts typically prioritize paving projects when campus surfaces start showing these issues:
Cracking and potholes — trip hazards are unacceptable where hundreds of children walk and play daily; open cracks also worsen quickly once water reaches the base
Uneven, heaved, or sunken areas — create fall risks on playcourts and walking routes, and complicate accessibility
Raveling and loose aggregate — deteriorating surfaces shed loose rock, a hazard around active kids
Standing water — puddling creates slip hazards and accelerates pavement failure
Aging surfaces at end of life — when patching becomes constant, repaving resets the maintenance clock for a decade or more
Summer construction windows — districts plan pavement work around breaks, which demands a contractor who mobilizes and finishes on schedule
Our School Paving Process
Site evaluation & scheduling — Assess the pavement condition and plan the work within the school's calendar — summer break, holidays, or weekends — so campus operations aren't disrupted.
Demolition & removal — Mill or remove failed asphalt and haul it away, often recycling it as reclaimed asphalt pavement (RAP).
Grading & drainage — Shape the surface to shed water away from buildings, walkways, and play areas.
Base preparation — Compact the base for uniform, stable support; repair any soft spots before paving.
Hot mix asphalt installation — Pave the new surface with a paver at consistent depth and grade for a smooth, uniform finish.
Compaction — Roll while hot with vibratory and finish rollers to achieve a dense, tight, long-lasting surface.
Transitions & cleanup — Tie in flush at walkways, gates, drains, and existing pavement — no lips or trip edges — then clean the site and allow cure time before students return.
Equipment Used on This Project
Asphalt paver
Milling/grinding machine — a core EARTHTEK specialty
Skid steers and grading equipment
Vibratory drum rollers and pneumatic finish rollers
Dump trucks and material transfer vehicles
Plate compactors for edges and tight areas
Lutes, rakes, and hand tools for finish work
The Result
A smooth, safe, uniform asphalt surface ready for daily campus life at Scott Lane Elementary — free of the cracks, trip hazards, and loose material that put students at risk, and delivered on a schedule that kept school operations running without interruption.
Need School or Campus Paving in Santa Clara or the South Bay?
EARTHTEK Paving and Grinding Inc partners with school districts and educational facilities across the Bay Area to deliver safe, durable asphalt paving on the schedules campuses require. Contact us today for a free project estimate.
Gallery
Get a Free Estimate
Fill out the form below and we'll get back to you within 1 business day.