EARTHTEK Paving and Grinding Inc completed this residential asphalt paving and sealcoating project in Silicon Valley, giving the home a smooth, durable new asphalt surface protected for the long haul. Our crew installed fresh hot mix asphalt built for daily vehicle use, with sealcoating as the finishing layer of defense against sun, water, and everyday wear.
Paving and sealcoating are a natural pair for homeowners who want their investment to last. The asphalt provides the structure; the sealcoat protects it — blocking UV oxidation, sealing out water, and keeping the surface looking freshly paved. In the South Bay's year-round sun, unsealed asphalt turns gray and brittle within a few years, while a sealed surface can deliver a decade or more of extra service life with simple periodic maintenance.
Scope of Work
Surface and base preparation
Hot mix asphalt paving installation
Compaction and edge finish work
Protective sealcoating
Why This Project Was Needed
Silicon Valley homeowners typically reach this decision point when their pavement shows the familiar signs:
Cracking and potholes — open cracks let water into the base, where damage spreads with every season
Gray, oxidized asphalt — constant sun exposure dries out unsealed pavement, making it brittle and prone to cracking
Sinking or uneven areas — signal base or drainage issues beneath the surface
Crumbling edges — unsupported driveway edges break apart along landscaping and borders
Rough, worn appearance — a tired driveway drags down curb appeal in neighborhoods where home presentation carries real value
Rising patch-and-repair costs — when fixes become routine, repaving with a protective sealcoat plan resets the clock
Our Residential Paving Process
Site evaluation — Assess the existing surface, base condition, and drainage; plan the work to protect landscaping and surrounding hardscape.
Preparation & removal — Remove failed pavement and prep the area down to a stable foundation.
Grading for drainage — Shape the surface so water sheds away from the garage and home foundation.
Base compaction — Compact aggregate base for uniform support — the step where driveway longevity is won or lost.
Hot mix asphalt installation — Pave at consistent depth with smooth, even coverage.
Compaction & edge work — Roll while hot for a dense, tight finish, with hand-tamped edges for clean lines and added strength.
Cure time — Keep vehicles off for 3–5 days while the new asphalt sets up.
Our Sealcoating Process
Cure first — New asphalt cures 6–12 months before its first sealcoat; the seal is then applied as the protection phase of the project.
Surface cleaning — Clean dirt and debris, and prime any oil spots so the sealer bonds properly.
Sealcoat application — Apply quality sealer in two uniform coats by spray or squeegee for full, even coverage.
Curing — Keep traffic off for 24–48 hours while the sealcoat cures.
Tip we share with every homeowner: resealing every 2–3 years is the single most cost-effective thing you can do to extend your driveway's life.
Equipment Used on This Project
Asphalt paver
Skid steer for prep and material handling
Vibratory drum roller
Plate compactors and hand tampers for edges
Sealcoating spray/squeegee equipment
Crew trucks and material transfer
Lutes, rakes, and hand finish tools
The Result
A smooth, jet-black asphalt surface with clean edges, proper drainage, and a protective sealcoat plan that locks in the like-new look — a major curb appeal upgrade built to handle daily driving and South Bay sun for years to come.
Need Asphalt Paving or Sealcoating in Silicon Valley?
From new driveways to protective maintenance, EARTHTEK Paving and Grinding Inc delivers residential asphalt paving and sealcoating built on proper preparation and quality materials. Contact us today for a free estimate.
Gallery
Get a Free Estimate
Fill out the form below and we'll get back to you within 1 business day.